skip to Main Content
+27 32 947 1203 +27 32 947 3007 admin@ilembeprecast.co.za
iLembe Slabs Logo

A partnership between iLembe Precast and Castle Slabs.

S200 BLOCK

RIB AND BLOCK by ILEMBE SLABS

S200 Block and Beam
S200 Render

SIMPLE INSTALLATION

  • Easy installation with a detailed Layout Drawing
  • Temporary propping required
  • Stripping time 10-14 days
  • Reduces insitu concrete up to 50%

S120 BLOCK

RIB AND BLOCK by ILEMBE SLABS

S120 Block
S120 Block 3D
S120 Block Profile

SIMPLE INSTALLATION

  • Easy installation with a detailed Layout Drawing
  • Temporary propping required
  • Stripping time 10-14 days
  • Reduces insitu concrete up to 50%

FLAT RIB / BEAM (USE WITH S200)

RIB AND BLOCK by ILEMBE SLABS

Flat Rib Section
Flat Rib 3D Render
FLAT RIB PROFILE

T SHAPE RIB / BEAM (USE WITH S200)

RIB AND BLOCK by ILEMBE SLABS

T Shape Rib / Beam Section
T Shape Rib / Beam 3D
T Shape Rib / Beam Profile

CONTACT ILEMBE SLABS FOR EXPERT ADVICE

S200 Installation Example

CONTACT US TODAY

Tel. +27 32 947 1203

Tel. +27 32 947 3007

Back To Top